Posted: Wed 12th Mar 2025

Sealand: Public consultation set to launch on plans to build huge solar farm by side of River Dee

News and Info from Deeside, Flintshire, North Wales

Plans for a huge solar farm and battery energy storage system (BESS) in running alongside the River Dee in Sealand have been unveiled, with developers seeking public feedback on the project before submitting it for approval.

The Sealand Manor Solar Farm & BESS, proposed by Renewable Connections, would generate up to 89MW of renewable energy—enough to power 33,575 homes annually—while the 40MW battery storage system would help balance electricity supply and demand.

The development, which would span 94 hectares of agricultural land, aims to support both Flintshire’s climate goals and the UK’s wider net-zero commitments. It is estimated to save up to 16,902 tonnes of CO₂ emissions per year, contributing to a greener energy grid.

Community Consultation

Before submitting the project to Planning and Environment Decision Wales (PEDW), Renewable Connections is inviting local residents to review the plans and provide feedback.

The informal consultation runs from 14 March to 21 April 2025, with a formal consultation phase planned later this year before an application is submitted to PEDW.

If approved, the solar farm will operate for up to 40 years, after which all installations will be removed and the land restored to agricultural use.

Key features of the proposal include:

Solar panels mounted in rows no more than 3 metres high, facing south for maximum efficiency.

Battery storage units (BESS) to store and release energy when needed, ensuring grid stability.

Hedgerow planting and biodiversity improvements, enhancing habitats for local wildlife.

Potential for sheep grazing beneath the panels, allowing continued agricultural use.

Security fencing and CCTV cameras around the site, focused inward to protect equipment.

Local Impact & Environmental Considerations

The proposed site, located adjacent to the River Dee between the A494 and Sealand Road, currently consists of arable farmland designated as Grade 2 agricultural land.

Although part of Flintshire County Council’s Green Barrier designation, developers Renewable Connections argue that the biodiversity management plan will significantly “will be significantly enhanced for biodiversity by creating a range of new habitats, offering food and shelter to wildlife.”

The project also aligns with the UK’s decarbonisation efforts, with the electricity grid expected to transition to 100% sustainable aviation fuel (SAF) by 2030.

Renewable Connections says local input will play a key role in shaping the final design of the project.

Later in 2025, a formal consultation will take place before submission to PEDW, where planning officers will assess environmental and community considerations.

The company has encouraged residents to engage early in the process to help refine the plans.

Two public exhibition events will be held at The Fig Tree, St Bartholomew’s Church, Sealand:

  • Wednesday 26 March, 2pm – 7pm
  • Thursday 27 March, 10am – 2pm

For those unable to attend, feedback can be submitted via:
📧 Email: [email protected]
🌍 Online form: Available on Renewable Connections’ website
📮 Freepost: Sealand Manor Solar Farm & BESS, Renewable Connections, Level 4, LDN: W, 3 Noble Street, London, EC2V 7EE

 

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: [email protected] Latest News

  • Air ambulances respond as A541 closed near Flintshire border after serious crash
  • Football Museum of Wales brings history to life in Connah’s Quay
  • Student duo a force to be reckoned with after winning awards for new clothing range

  • More...

    Air ambulances respond as A541 closed near Flintshire border after serious crash

    News

    Football Museum of Wales brings history to life in Connah’s Quay

    News

    Student duo a force to be reckoned with after winning awards for new clothing range

    News

    £10m to boost jobs and wellbeing support in Wales

    News

    Ambitious expansion plans submitted for Christmas Farm near Flintsire border

    News

    Pothole-related breakdowns double, says RAC

    News

    Thousands more driving tests each month to cut wait times

    News

    Flint man jailed after attack on teen and police officer

    News

    Plans to convert Shotton’s old police station into home

    News